Kanakanagar – RT Nagar post Bangalore -560032 will get a Railway Station under BSRP
A Well-Developed Locality which falls under the RT Nagar post is Well connected to the National Highway 44 via the Outer Ring Road, Kanaka Nagar will also have the Metro Station at the Veeranpalya on the Blue Line Metro
Kanakanagar is connected on the Mallige Line and one can Travel to Hebbal, Lottegolhalli, Yeshwanthpur, Jalahalli and upto Chick Banavar on one side and Banaswadi, MS Nagar, Baiyapanahalli and upto KR Puram on the other side ( See the List of the Stations )
This Gives the Boost to the Real Estate Sector, The Current ongoing Residential Land Prices in Kanakanagar varies from Rs 9000/ sqft to 12000/sqft
Bengaluru Suburban Rail Project (BSRP) : Bengaluru Suburban Rail Project (BSRP) is an under construction 149.348 km commuter rail network with 64 stations in Bangalore, Karnataka.
The project’s feasibility report and final detailed project report (view DPR’s PDF) were prepared by RITES suggesting 4 lines / corridors.
The project was approved for construction by India’s Central Government in October 2020 with an estimated cost of Rs. 15,767 crore. Its foundation stone was laid on June 20, 2023 by India’s Prime Minister Narendra Modi.
Bengaluru Suburban Rail project is being implemented by Rail Infrastructure Development Company (Karnataka) Limited (K-RIDE) with a deadline of 2026.
The project’s Corridor 1 & 3 will be funded by a Euro 500 million (Rs 4,552 crore) loan by KfW Development Bank with whom the Government of India signed an agreement in December 2023.
Key Figures
Operational: 0 km | Under Construction: 54.9 km | Approved: 94.4 km
Elevated Routes: 45.392 km | At-Grade Routes: 103.856 km
System Specifications
Maximum Speed: 90 kmph
Operational Speed: 35 kmph
Track Gauge: Broad Gauge
Bengaluru Suburban Rail Route Information
Corridor 1: Sampige Line
Route: KSR Bengaluru – Yelahanka – Devanahalli
Length: 41.478 km
Type: Elevated (19.22 km) & At-Grade (22.278 km)
Depot: Akkupet Depot
Number of Stations: 15 (8 elevated & 7 at-grade)
Station Names: KSR Bengaluru City (interchange), Srirampura (future), Malleswaram, Yesvantpur (interchange), Muthyal Nagar, Lottegollahalli (interchange), Kodigehalli, Judicial Layout, Yelahanka, Nitte Meenakshi, Bettahalasoor, Doddajala, Airport Trumpet, Airport Terminal, Airport KIADB, Devanahalli
Note: A suburban rail link is proposed to Bengaluru International Airport
Corridor 2: Mallige Line
Route: Baiyyappanahalli Terminal – Chikkabanavara (Kanakanagar )
Length: 24.866 km
Type: Elevated (7.723 km) & At-Grade (17.143 km)
Depot: Jalahalli Depot
Number of Stations: 14 (6 elevated & 8 at-grade)
Station Names: Chikka Banavara, Myadarahalli, Shettyhalli, Jalahalli (future), Yesvantpur (interchange), Lottegollahalli (interchange), Hebbal, Kanaka Nagar, Nagawara, Kaveri Nagar (future), Banaswadi, Seva Nagar, Kasturi Nagar, Baiyapanahalli (interchange)
Corridor 3: Parijaata Line
Route: Kengeri – Whitefield
Length: 35.52 km
Type: Elevated (10.40 km) & At-Grade (25.12 km)
Number of Stations: 14 (4 elevated & 10 at-grade)
Station Names: Kengeri, RV College (future), Jnanabharati, Nayandahalli, Krishnadevaraya, Jagjeevanram Nagar, KSR Bengaluru City (interchange), Kumara Park, Bengaluru Cantt, Bengaluru East, Baiyapannahalli, Krishnarajapura, Hoodi, Whitefield
Corridor 4: Kanaka Line
Route: Heelalige – Rajankunte
Length: 46.285 km
Type: Elevated (8.96 km) & At-Grade (37.92 km)
Depot: Silkboard Depot
Number of Stations: 19 (4 elevated & 15 at-grade)
Station Names: Rajankunte, Muddana Halli, Yelahanka (interchange), Jakkur, Hegde Nagar, Thanisandra, Hennur, Horamavu, Channasandra, Benniganahalli (interchange), Kagadaspura, Doddanekundi, Marathahalli, Belandur Road, Carmelaram, Ambedkar Nagar, Huskur, Singena Agrahara (future), Bommasandra (future), Heelalige
Note: 5 stations will serve as interchange stations – Bangalore City (1 & 3), Yesvantapur (1 & 2), Lottegollahalli (1 & 2), Yelahanka (1 & 4) and Benniganahalli (2 & 4)
Metro Line
Line-5 – Blue Line: KR Puram – Hebbal – KIAL Terminals
Length: 37 km
Type: Elevated, At-Grade and Underground (within the airport)
Depot: Shettigere Depot (in addition to Phase 2A’s Baiyappanahalli Depot)
Number of Stations: 17
Station Names: Kasturinagara, Horamavu, HRBR Layout (erst. Babusaheb Palya), Kalyan Nagar, HBR layout, Nagawara, Veerannapalya, Kempapura, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka (erst. Kogilu Cross), Bagalur Cross (erst. Bagalur/PRR Cross), Bettahalasuru, Doddajala (erst. Trumpet Junction), Airport City (erst. Sky Garden, to be built at-grade) and KIAL Terminals (erst. Airport Terminal, to be built partially underground)
Like our Facebook page https://www.facebook.com/propheadlines/
For Latest Real Estate Investment News on Kanakanagar Log on to https://propheadlines.com/
Real Estate Portfolio is handled by Prop headlines Sovereign Real Estate Investors Funds – Bangalore